Permit drawings submitted

As previously mentioned, the process of even getting to the construction phase is quite slow. At this point, the architectural drawings have been completed and submitted to DCRA for the permits. I am told it will take 4-6 weeks for approval. Let the waiting game begin.

Screen Shot 2016-06-23 at 12.18.55 PMScreen Shot 2016-06-23 at 12.19.38 PM